ONLINE MANUAL
Scan this QR Code with your
mobile device to take you to
the online manual.
3. MIXING BLADE ASSEMBLY 4. LOCKING PLATE ASSEMBLY 6. PLACEMENT 7. CONTROLS
KNOW YOUR PRODUCT
1. FRAME ASSEMBLY 2. DRUM ASSEMBLY
5. TIPPING HANDLE & MOTOR ASSEMBLY
1 Tipping Handle
2 Drum Assembly
3 On/Off Switch
4 Motor and Motor Housing
Assembly
5 Locking Plate
6 Frame Assembly
7 Wheels
CEMENT MIXER
8 Assembly Fasteners
9 Lower Drum
10 Locking Plate
11 Tipping Handle
12 Mixing Blades
13 Rubber Gasket
14 Upper Drum
15 Support Leg
16 Motor and Motor Housing
17 Wheels
18 Frame
19 Wheel Frame
ASSEMBLY COMPONENTS
SETUP & PREPARATION
1
2
3
4
5
6
7
14
15
16
17
18
8
9
10
11
12
13
WARNING! ENSURE THE TOOL IS SWITCHED OFF AND
DISCONNECTED FROM THE POWER SUPPLY BEFORE
PERFORMING ANY OF THE FOLLOWING ASSEMBLY.
Tools Required (Not Supplied)
2. First place 2 large washers
then wheel, followed by
another 3 large washer onto
axle of the wheel frame,
secure the assembly with split
pin. Repeat assembly for other
wheel.
2. With the help of a second
person, carefully set the lower
drum onto the side supports
of the frame assembly. Ensure
the large diameter shaft is
at the support leg end of the
stand
6. Position the upper drum over
the rim of the lower drum.
Ensure that all the mounting
holes align as well as the
arrows on either side of the
rim.
2. Slide the locking plate over
the large diameter shaft at
the support leg end of the
frame assembly. Ensure
the plate is correctly
aligned with the bearing
bracket and clear of the
circlip.
3. Insert the M10x70
bolt with washer and
secure with washer
and nut. Tighten with
17mm spanner (not
supplied).
Note: Ensure the tipping
handle easily pivots
on the large shaft so
that the locating pins
can be engaged and
disengaged.
The product may only be placed on a at surface. To provide added
stability screw the product to a concrete oor with the proper xation
materials including bolts, screws and washers.
1. Disengage the locating pins
by pulling out on the control
handle away from the locking
plate to allow the drum to
rotate.
The drum can be set
at different position to
cater for mixing mortar
and concrete, emptying
or storing.
4. Insert the M8x65 hex bolts
with washer through the 2
holes from one side and the
M8x55 hex bolt with washer
through the end hole of the
support leg and secure with
nut.
4. Align the Rubber Gasket with
the holes and screw heads on
the lower drum.
Note: Ensure the Rubber Gasket
is not twisted and at on the lower
drum.
2. Insert the M8x16 bolt and spring into the tube of the tipping handle.
Engage the locating pins into the locking plate and use this as a
lever to compress the spring against the large shaft.
The Support Leg has two
mounting holes that can be used
to ensure sufcient stability. Use
two screws or bolts (not included,
recommended size M10 ) to secure.
ON
OFF
Mortar
Concrete
Unload
Storage
ON
OFF
Mortar
Concrete
Unload
Storage
1. Use assembly
fasteners bag
1. Use assembly
fasteners bag
5. Use assembly
fasteners bag
1. Use assembly
fasteners bag
1. Use assembly
fasteners bag
4. Use assembly
fasteners bag
3. Engage the control handle
locating pins to secure the
position.
3. Align and insert
wheel assembly and
support leg into the
frame.
3. Secure the lower drum
to the frame assembly by
inserting the M8x55 bolts
with washers into the side
supports and secure with
the nuts. Tighten with 13
& 14mm spanners (not
supplied).
7. Insert the M8x20 bolts, spring
washers and at washers into
each of the mounting holes in
the rim. Secure each bolt with
14mm spanner (not supplied).
3. Insert the 2 M8x30 hex bolts,
spring washers and washers.
Secure with nut from rear of
bearing bracket. Tighten with
13 & 14mm spanners (not
supplied).
Drip Loop
To avoid the possibility of the appliance plug or power point getting wet,
the user should arrange a “drip loop” in the cord connecting the cement
mixer to a wall mounted power point.
The “drip loop” is the part of the cord that sits below the level of the
power point (or the connector if an extension cord is used). It prevents
water travelling along the cord and coming in contact with the power
point.
2. Insert 2 M8x20 bolts and washers into the upper and lower drum
from the outside. Place the rubber washer, thin washer onto the bolt
followed by the end of the mixing blade and secure with thin washer
and nut.
Spanners 13, 14 & 17mm.
Note: It is recommended that two people assemble the cement mixer.
2
4
M8 55
M8 65
M8 60
M8 20
M8 20
M8 30
M8 20
1
M10 70
2
10
2
2
4
2
2
2
6
4
M8 55
M8 65
M8 60
M8 20
M8 20
M8 30
M8 20
1
M10 70
2
10
2
4
M8 16 1
1
2
M8 25
4
4
4
8
2
4
2
2
2
6
4
M8 55
M8 65
M8 60
M8 20
M8 20
M8 30
M8 20
1
M10 70
2
10
2
4
M8 16 1
1
2
M8 25
4
4
4
8
Bolt
Thin Washer
Nut
Rubber Washer
Washer
CMX-125U
2
4
2
2
2
6
4
M8 55
M8 65
M8 60
M8 20
M8 20
M8 30
M8 20
1
M10 70
2
10
2
4
M8 16 1
1
2
M8 25
4
4
4
8
A
B
C
D
E
F
G
A
B
C
D
E
F
G
19
5. Insert the M8x65 hex bolts
with washer through the 2
holes from one side and the
M8x55 hex bolt with washer
through the end hole of the
wheel assembly and secure
with nut.
6. Tighten bolts and nuts assembled in above steps 4 & 5 with a 13
and 14mm spanners (not supplied).
2
4
2
2
2
6
4
M8 55
M8 65
M8 60
M8 20
M8 20
M8 30
M8 20
1
M10 70
2
10
2
4
M8 16 1
1
2
M8 25
4
4
4
8
1. Use assembly
fasteners bag
2
4
2
2
2
6
4
M8 55
M8 65
M8 60
M8 20
M8 20
M8 30
M8 20
1
M10 70
2
10
2
4
M8 16 1
1
2
M8 25
4
4
4
8
3. Repeat step 2 for the second mixing blade. Then ensure both ends
of the mixing blades are tight.
Note: Position the mixing blade inside the drum assembly with the
pointed end facing downward.
2
4
2
2
2
6
4
M8 55
M8 65
M8 60
M8 20
M8 20
M8 30
M8 20
1
M10 70
2
10
2
4
M8 16 1
1
2
M8 25
4
4
4
8
2
4
2
2
2
6
4
M8 55
M8 65
M8 60
M8 20
M8 20
M8 30
M8 20
1
M10 70
2
10
2
4
M8 16 1
1
2
M8 25
4
4
4
8
5. Slide the motor and
motor housing over
the pinion shaft lining
up the key ways.
Secure the motor and
motor housing to the
frame with the bolts,
spring washers and
washers. Tighten with
14mm spanner (not
supplied).
WARNING! DO NOT PLACE ANY MATERIAL UNDER THE
PRODUCT TO ADJUST THE HEIGHT OR TO ATTEMPT
TO IMPROVE ITS STABILITY! IF THE PRODUCT IS ON
AN ANGLE AND/OR WOBBLY, MOVE IT TO A DIFFERENT
LOCATION. NEVER OPERATE THE PRODUCT ON SOFT
SURFACES SUCH AS A LAWN OR GRAVEL SINCE IT
COULD SINK OR TIP OVER DURING OPERATION!
CAUTION! TO REDUCE THE RISK OF ELECTRICAL
SHOCK, THE USE OF A RESIDUAL CURRENT DEVICE
(RATED 30mA OR LESS) IS RECOMMENDED.
OPERATION
Setting the Operating Position
2. Rotate the drum to the desired
position by aligning the
locating pin with two of the
holes in the locking plate.
ON
OFF
Mortar
Concrete
Unload
Storage
Turning the Mixer On and Off
ON
OFF
Mortar
Concrete
Unload
Storage
1. To start the mixer press the green
on “I” button.
2. To stop the mixer press the red off
“O” button..
ON
OFF
Mortar
Concrete
Unload
Storage
WARNING! HOLD THE CONTROL HANDLE TIGHTLY
WHILE TURNING IT.
Praat mee over dit product
Laat hier weten wat jij vindt van de Ozito CMX-125U Cementmixer. Als je een vraag hebt, lees dan eerst zorgvuldig de handleiding door. Een handleiding aanvragen kan via ons contactformulier.
beantwoord | Ik vind dit nuttig (0) (Vertaald door Google)